TONIBUNG

The Long Tanid Micro Hydro is a community-based project. This model has been develop and refine by Tonibung for the last 20 years. Tonibung together with the help of the Long Tanid community build a 20kwh Micro hydro system. The project primarily sets out to address the use of fossil-fuelled generators for electricity in Kg Long Tanid Sarawak, provide important GHG emissions reductions and a model for sustainable electricity supply in rural Malaysia.

The Micro Hydro system provide villagers with abundant, reliable 24-hour electricity at a lower cost than its currently available through the use of diesel generators.

Share this page

Other winners

Bornean Sun Bear Conservation Centre

Sun bear is a threatened species listed as “Vulnerable” under the IUCN Red Book Listing of endangered species. BSBCS providing an improved long-term living environment and proper care for captive,

Prudential Assurance Malaysia

Prudential Assurance Malaysia Berhad (PAMB) was established in Malaysia in 1924. For our 2017 financial year which ended 31 December 2017, we achieved RM1.61 billion in new business sales. New

Ada Biotech Sdn Bhd

Ada biodegradable straw is the ultimate solution to replace single-use straws. Ada biodegradable straws are made of 100% plant-based ingredients that biodegrades in less than 100 days. Our straws do